The playfield swap for Bobby Orr is now complete. The harness has been cleaned, and tightened up.
All switches , upright targets, have been cleaned, and adjusted.
There will be bad lamp sockets to change, but I will do that after power-up.
In the back round all solenoid assemblies have been dismantled, cleaned and rebuilt, photos to follow.
Power transformer / rectifier, and boards, still need to be done.
Main cabinet is in the paint booth.
The backbox has been painted, and cleared.
Playfield rails have been painted, and clear coated.
All cabinet metal has been sand blasted, and powder coated.