New CPR playfield swap completed, and installed into cabinet for testing of Solenoids, Switches, and Lamp circuits, prior to build out.
Further testing was required as ramps and toys added.
All sytems tested out 100%.
New 4-piece Starship Fantasy ramp set being installed, which includes the under playfield subway.
New CPR plastic set.
New red & blue jewel posts.
New LED 4-player display system also need to be added, as 3 of the plasma were gassed out.
Lots of photos added of the playfield build-out process.