Both head and main body of the cabinet have now been painted, and cleared.
Playfield swap is well underway, with top side buildout now started.
Board sets being rebuilt, and power rectifier is completed, as seen in last update.
Solenoid assemblies being rebuilt in the backround, photos soon.
All cabinet metal being sand blasted, and powder coated.
Playfield metal out of the tumbler.