1986 Williams Grand Lizard, you don’t see this title pop up to0 often; did not have a large production run.
This will be receiving a full 3-stage restoration, as described in the “Repair & Restoration process”.
This update will focus on the stripping of the backbox, and the tear down of both the underside + topside of the playfield.
Many people ask if they can purchase the pin during this restoration process, well this title is spoken for, BUT, I will be completing second Grand Lizard build around a extra playfield, and boardset that is available to buy.
I’m searching for parts for that build if any of you have the following, please contact me.
Transformer, Mid 80’s Williams lower donor cabinet, 4-flipper button side rails, EMI filter housing, Lower cabinet wiring harness, Lock down bar, and receiver, Backbox hinge set, Backbox lower speaker panel mount bar, Backbox player display insert board, and finally, the Backbox wiring harness.
I fully expect to have to make the wiring harness, and side rails, but if you gents could dig around in your parts boxes I will purchase what you have.
Ok, this playfield was in very decent condition, lower was fully Mylared, and in high wear areas doubled.
Interesting fact, the circular orange target lines around the left/right magna-save were a after thought, and applied using a very thin sticker, which it’s self then had a size matching circular Mylar applied, then covered again with the main lover PF Mylar sheet.
These two stickers have to stay put, and will be covered with the 2-part automotive clear, once the playfield is touched up, and ready for such.
The upper PF had zero Mylar, and as a result needs touch-up where the ball dropped off the lizards tongue.
In what I’m guessing was a “on the fly” location repair; a 2″ nail was used to secure a plastic post to the PF after the original post snapped.
After many ball hits, the nail allowed the post to wobble, which in turn chewed up the PF surface, leaving a divot; this repair procedure will be photo documented.
Upper playfield has been stripped.
Underside has had all solenoid assemblies removed, and each will be torn down cleaned, and rebuilt; and yes all the main base frames will be powder coated…..I know!
The underside wiring harness, light inserts, and bulb sockets have all been cleaned. The harness was tidied up with new, and extra 3″ zip ties.
All new color matching “Absolute” LED bulbs were added.
During the harness cleaning, I did find a lighting wire that had been pinched, and coating was torn, exposing the live circuit.
Also found some bad bulb sockets on the multiple socket arrays, had to get creative here. (see photos)
More to follow.