Cabinets are now in the paint booth, with base coat being applied.
The paint stencil kit has arrived.
Both upper and lower playfields have been stripped.
The wiring harness on the larger (lower ) playfield has been cleaned and tightened up.
The swap of that harness from original to new playfield has been completed.
All solenoid assemblies have yet to be cleaned, and rebuilt.
Board set upgrades are underway.
All playfield metal is tumbling.