The Big Game restoration is progressing. Electronics are being upgraded. Some photos included of the power/rectifier board being upgraded.
Cabinet has been stripped down, and a few minor touch-ups being completed. Cabinet insert board have been stripped of components, so they could be painted.
The playfield side rails were repainted same color as the insert boards.
All metal is off to the sandblast powder coat station.
Underside of playfield has been cleaned, harness tightened up.
Topside of playfield has been stripped, scrubbed, then paint touch-ups completed, and finally cleared with 2-part automotive clear.
All playfield metal has been tumble polished.
Now working on rebuilding the solenoid assemblies.