Getting prepped for the playfield swap on this project.
Main body is in the paint booth, and should be completed by Oct.03, then the backbox can be started.
All the cabinet and playfield metal has returned from being bead blasted, and powder coated.
Solenoid assembly rebuilding / cleaning has started.
Board sets need to be rebuilt/ upgraded yet.
Many photos of the underside, and inside of the cabinet painting process were lost when my camera glitched, so there will be a progression jump, with missing steps.
Likewise for the playfield teardown.
